Views: 0 Author: Site Editor Publish Time: 2025-02-18 Origin: Site
Specification
Performance/Specification | TGDC30-30 | TGDC45-45 | TGDC60-60 | TGDC80-80 | TGDC100-100 | TGDC120-120 | |
Two-way Limited Rally (KN/m)>= | 30 | 45 | 60 | 80 | 100 | 120 | |
Two-way Limited elongation ratio(%)<= | 3 | 3 | 3 | 3 | 3 | 3 | |
Elongation at a% of the rally (KN/m)>= | 23 | 36 | 48 | 63 | 81 | 98 | |
Width(m) | 6m |
1)pavement subgrade stabilization.
2)Area/ground stabilization.
3)Pavement base reinforcement.
4)Working&load transfer platforms.
5)Reinforced granular foundation beds.