shaun@zhongloo.com                                   +86-551-65540070
|
|
You are here: Home / Products / Geogrid / Steel-plastic Geogrid / Steel-Plastic Geogrid for Civil Engineering Construction Retaining Wall Reinforcement Geogrid

Hot-Selling Products

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Steel-Plastic Geogrid for Civil Engineering Construction Retaining Wall Reinforcement Geogrid

Steel-plastic reinforced geogrid is made of steel-plastic reinforced tape compounded by a novel process, the surface of this product has a regular coarse pattern can withstand the huge anti-stress and friction with the fill.
Widt:
Color:
Length:
Availability:
Quantity:
  • Steel-plastic Geogrid

  • Zhongloo


Product introduction

The steel plastic composite geogrid uses high tensile steel wires (PET yarn or fiberglass yarn) specially handled with polyethylene(P.E) and other assistants. After squeeze and cooling procedures, steel wires turns to high-strength anti-pull belt with rough embossing surfaces and PE coating. Earthwork belts are warp knitted at vertically and horizontally directions and welded the joints using a special unltra-sonic welding techology to structure steel plastic composite geogrid.


Technical parameter


ProjectTGSG30-30TGSG45-45TGSG60-60TGSG80-80TGSG100-100TGSG120-120
Two-way Limit-Rally
(KN/m)≥
30456080100120
Two-way Limit elongation
(%)≤
333333
Elongation at 1% of the
Rally   (KN/m)≥
233648638198



Product Features

1.The intensity is high and the distort is small;

2.The wriggle is small;

3.Anti-corrosive,the life is long,the geogrid take the plastic material as a  protector, auxiliary  enables it by each kind of assistant to have the antiaging,the oxidation susceptibility again,but acidproof ,alkali,salt and so on adverse circumstance corrosion.Therefore ,the steel modles the earhwork gril to be possible to  meet each kind of permanent work100year above use need,and the perfor mance is superior,the size stability is good;

4.The construction is convenient ,the cycle is quickly short.the cost is low;the steel plastic complex  geogrid to lay down,joining ,the localization to be easy,to be smooth,avoids overlapping crossover,but reduced the project cycle effectively,saved the building cost of projects by 10%-50%.


Previous: 
Next: 

ABOUT US

PRODUCTS

NEWS

CONTACT US

  +86-18095658976
 +86-551-65540070
  shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Leave a Message
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong