Description:
Geotube is made from high strength polypropylene bag, can also use woven cloth material, choose the product material according to the project actual demand; Common black; Adjusted according to different specifications of products commonly used material 400 gsm; Unlimited length, the width can be multiple image splicing unlimited width, but directly affect the dehydration tube bag material intensity range is wider requirements material strength is higher; Basic order fill height for two-thirds of the diameter of the tube bag; According to the construction site of the grouting machine diameter custom, can according to actual situation or adding medicament (increased solidification speed accelerate spate separation).
Advantage:
1. Resistant to moisture.
2. Chemical resistance.
3. Anti-biodegradation and animal destruction.
4. High temperature resistance.
5. UV resistance.
Item | Unit | Technical Parameters | ||||
Tube 500 | Tube 750 | Tube 1000 | ||||
Breaking strength | MD | KN/m >= | 70 | 120 | 200 | |
CD | KN/m >= | 90 | 120 | 200 | ||
Elongation of break | MD | %<= | 20 | 20 | 20 | |
CD | %<= | 10 | 10 | 10 | ||
Sewing Tensile strength | >=% | 80 | 80 | 80 | ||
Bursting Strength(CBR) | KN>= | 8 | 14 | 18 | ||
Equivalent opening size(O90) | mm | 0.2-0.6 | 0.2-0.6 | 0.2-0.6 | ||
Permeability(Q50) | L/m2/s>= | 20 | 13 | 15 | ||
UV-resistance(500HRS strength retention) | %>= | 90 | 80 | 80 |
| |
Convenient and quick Diameter and length can be adjusted according to the need, high plasticity, and can be stacked, transportation is convenient. | Low noise Fully enclosed construction, little noise, is not easy to cause secondary pollution. |
| |
Wide application The size of the wastewater treatment and sludge dewatering engineering all can use. | Capacity reduction effect is good Within one month of the sludge volume can reduce more than 90%, basically for subsequent removal and handling easier. |
Application:
1. Both rivers.
2. mine regreen.
3. Treatment of landslides, gutters, soil erosion, irrigation systems.
4. Constructed wetland repair.
5. Green roof.
PS: The first step is to fill, high strength and permeable geotextile bag body needed to make into actual, then filling slurry into the bag.
PS:The second step is drainage, because the geotextile that makes up the bag has tiny holes that trap it in the mud, solids can also discharge water from the mud, which can effectively reduce the volume of inclusion in the bag body,The bag body can be repeatedly filled until the allowable height of the bag material is reached, and the discharged water can be reused.
PS: The third step is consolidation. After repeated filling and drainage, the fine particles left in the bag body will gradually consolidate due to drying.
Anhui Zhonglu Engineer Materials Co., Ltd