English
Pусский
Español

You are here: Home / News

News

  • The project to extend the continuous ash disposal facility (ADF) at Eskom’s Majuba power station has passed its midway point. The project will ensure that waste residue from the boiler furnaces is responsibly stored.
    The project’s contractor, Concor, reported being over halfway with extending the continuous ash disposal facility, located near Amersfoort in Mpumalanga. This project will ensure that the coal-fired power plant can continue generating electricity while complying with ever-stricter environmental regulations regarding the responsible storage of waste.
  +86-18095658976
 +86-551-65540070
   shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong