English
Pусский
Español

You are here: Home / News

News

  • The Geotube Installation ProcessFirst, clear effluent water is drained, leaving the solid within the container. Once full, the containers are disposed of at a landfill, or sludge can be removed. The geotube installation process involves three steps:1. FillingThe dredged material is pumped into the g
  • Geotube is made from high strength polypropylene bag, can also use woven cloth material, choose the product material according to the project actual demand; Common black; Adjusted according to different specifications of products commonly used material 400 gsm; Unlimited length, the width can be mul
  +86-18095658976
 +86-551-65540070
   shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong