You are here: Home / News

News

  • Preparation before construction:一.Measurement, stakeout and site cleaning1. Measure and stake out the construction site according to the construction specifications and design requirements.2. The original ground shall be cleaned and rolled, and the base treatment shall be the same as that of the gen
  +86-18095658976
 +86-551-65540070
   shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong