Publish Time: 2022-07-07 Origin: Site
HDPE Geomembrane liner are made from polyethylene polymer materials that blow molding,its main function is to prevent the liquid leakage and gas volatile.According to the production of raw materials can divide into HDPE geomembrane liner and LDPE geomembrane liner,etc.
Product name | Zhongloo Fish Shrimp Farming HDPE Geomembrane Liner Pond Geomembranas |
Usage | Waterproof and seepage control project |
Color | Black/blue/double color |
Material | HDPE/LDPE/LLDPE/EVA |
Thickness | 0.1mm-3.0m 1m-8m in roll width, the length as client's request |
Service valid term | More than 10 years! |
Payment term | L/C D/A D/P T/T Western Union Money Gram |
Packing detail | Packing in woven bags. Keep it away from fire. |
Property | Good flexible ,UV treated,Excellent environmental stress cracking resistance property,Low temperature resistance, corrosion resistance, aging resistance. |
Specific Use | Municioal environmental project, water conservancy projects,Landfill cap, mining heap leach pads, pond liner, canal linings, tank, linings, raw water treatment reservoirs, retention ponds,Waste water treatment lagoon, secondary containment. |
Laying of HDPE geomembrane
1. Before laying HDPE geomembrane, the corresponding acceptance certificate of civil engineering should be obtained.
2. Before the HDPE film is cut, its relevant dimensions should be accurately measured, and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. It should be numbered one by one and recorded in detail on a special form.
3. When laying HDPE geomembrane, the minimum number of welds should be sought, and raw materials should be saved as much as possible under the premise of ensuring quality. At the same time, it is easy to guarantee the quality.
4. The lap width of the seam between the film and the film is generally not less than 10cm, and the welding seam is usually arranged parallel to the maximum slope, that is, along the slope direction.
5. Usually in corners and deformed areas, the length of the seam should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than 1:6, within 1.5 meters from the top slope or the stress concentration area, no welds should be provided as much as possible.
6. During the laying of HDPE geomembrane, artificial folds should be avoided. When the temperature is low, it should be tightened as much as possible and paved.
7. After the HDPE geomembrane is laid, walking on the membrane surface, moving tools, etc. should be minimized. Any objects that can cause harm to the HDPE membrane should not be placed on the membrane or carried on the membrane to avoid damage to the membrane. cause accidental damage.
Anhui zhonglu Focus on geomembrane brand buildingfor more than 10 years,Source manufacturer/support customization/ingenuity quality/intimate after-sales.If you have
any questions, please contact us and we will contact you as soon as possible.(summer@zhongloo.com)