shaun@zhongloo.com                                   +86-551-65540070
|
|
You are here: Home / News

Ash disposal facility progress at Eskom’s Majuba power station

These are related to the Ash disposal facility progress at Eskom’s Majuba power station news, in which you can learn about the updated information in Ash disposal facility progress at Eskom’s Majuba power station, to help you better understand and expand Ash disposal facility progress at Eskom’s Majuba power station market. Because the market for Ash disposal facility progress at Eskom’s Majuba power station is evolving and changing, so we recommend that you collect our website, and we will show you the latest news on a regular basis.
  • The project to extend the continuous ash disposal facility (ADF) at Eskom’s Majuba power station has passed its midway point. The project will ensure that waste residue from the boiler furnaces is responsibly stored. The project’s contractor, Concor, reported being over halfway with extending the continuous ash disposal facility, located near Amersfoort in Mpumalanga. This project will ensure that the coal-fired power plant can continue generating electricity while complying with ever-stricter environmental regulations regarding the responsible storage of waste.

    2021.10.22

    Read More

ABOUT US

PRODUCTS

NEWS

CONTACT US

  +86-18095658976
 +86-551-65540070
  shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Leave a Message
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong