shaun@zhongloo.com                                   +86-551-65540070
|
|
You are here: Home / News

River Bank Geotube

These are related to the River Bank Geotube news, in which you can learn about the latest trends in River Bank Geotube and related information industry, to help you better understand and expand River Bank Geotube market.
  • The Geotube Installation ProcessFirst, clear effluent water is drained, leaving the solid within the container. Once full, the containers are disposed of at a landfill, or sludge can be removed. The geotube installation process involves three steps:1. FillingThe dredged material is pumped into the g

    2023.05.06

    Read More
  • FUNCTIONSGeotube dewatering containers are supplied to site and placed into position. Sludge which is treated with specialist polymers is then pumped into the containers and the clear effluent water is then drained leaving the solid remains within the container. When full the containers can be dispo

    2023.03.07

    Read More

ABOUT US

PRODUCTS

NEWS

CONTACT US

  +86-18095658976
 +86-551-65540070
  shaun@zhongloo.com
  Innovation Entrepreneurship Park Economic Development District in Hefei, Anhui China
Leave a Message
Copyright © 2021 Anhui Zhonglu Engineering Materials Co., Ltd. | Sitemap    Support by Leadong