-
The Geotube Installation ProcessFirst, clear effluent water is drained, leaving the solid within the container. Once full, the containers are disposed of at a landfill, or sludge can be removed. The geotube installation process involves three steps:1. FillingThe dredged material is pumped into the g
-
FUNCTIONSGeotube dewatering containers are supplied to site and placed into position. Sludge which is treated with specialist polymers is then pumped into the containers and the clear effluent water is then drained leaving the solid remains within the container. When full the containers can be dispo